Summer fitness walk - Black Mountain #1 of 4.

Summer fitness walk - Black Mountain #1 of 4.

Mon 06th Jan 2025

Open to Public 1 Spot Left

Part-day walk

Login or Sign up

*
*

Or

Create new account

This is part of the Club's Fitness walk series, with walks held over 4 weeks on Monday evenings at Black Mountain Nature Reserve (Week 1: 6th Jan, Week 2: 13th Jan, Week 3: 20th Jan & lucky last Week 4: 27th Jan). l plan to do the uphill sections at a moderate pace, however the downhill sections will be slower.

Planned Route:
From our starting point, we soon veer off the main fire trail towards the Summit Path, to go along the Botanic Gardens trail approx 200m till reaching the first track going up that connects with 'Hat band' / Forest loop (73m climb). Have bit of a breather along the Hat Band (flat), before linking up with another bush track (narrower, 36m climb) that intersects with the Summit path. The bush tracks going up are very distinct, however rocky underfoot and gravelly. Once reaching the top, we then head down on the Summit path (formed concrete path) till reaching the junction with the 'Hat Band '/ Forest Loop track. At the junction, we turn onto the Hat Band track heading anticlockwise and continue approx 100m till reaching a small forest track going down, which connects with Black Mountain Road fire trail. On a wide and steep fire trail, we then loop back up to connect with the Summit path and climb to the very top again (100m climb). We reach the top twice, however the second time is not from the very bottom, already half way up! From the top, we then head back down along the Summit path to our cars. You can view these tracks on Friends of Black Mountain walks (https://www.molonglo.org.au/copy-of-fobm-template).

We will follow the same route Week 1 and Week 2, however have a slight variation in the climb for Week 3, and it requires a little more effort. The breather along the 'Hat Band'/Forest loop is also removed. This is repeated for Week 4.

Please book on bilby. If the activity needs to be cancelled (too hot, or wet), booked participants will be notified on day of the walk by 5.00pm. Please be ready to start walking at 6.30pm.

Additional Information

Booking deadline

Mon 06th Jan 2025 02:00pm

Length

Short

Terrain

Easy

Distance (km or hrs)

4.20km

Ascent

280m

Descent

280m

Map name

Canberra

Terrain information

Wide Fire trails & bush tracks (steep, rocky and gravelly), formed path (concrete) and steps.

Transport information

Self drive to the dirt parking area on Frith Road in front on the Actew Sub Station (see drop pin in Activity Location). Please be ready to start walking at 6.30pm.


A walk or similar activity with a duration of a day or part day. No overnight gear required.

Date and Time

Start: Mon 06th Jan 2025 @ 06:30pm
Approx Return: Mon 06th Jan 2025 @ 08:30pm
Add to calendar

Login to view owner and location details

Ask a question about this activity!

When you send a message to an Activity Owner, Bilby will create a new booking record registered as "Interested" where you can track responses to your message.


Please review the "Acceptable Use Policy" in our Terms of Service when submitting content.

Login to leave a message...

Featured image for Evening Walk: Narrabundah Hill, Duffy

Thu 23rd Jan 2025

Evening Walk: Narrabundah Hill, Duffy

A short 7 km walk at Narrabundah Hill which is actually at Duffy, at the western end of Weston Creek. All on fire trails. Mix of pine and native veget...

Open to Public
Featured image for Daylight saving fitness training walk - Mt Majura

Tue 21st Jan 2025

Daylight saving fitness training walk - Mt Majura

In January 2025 fitness training walks will be conducted up Mount Majura each Tuesday (7, 14, 21 & 28 January). The walks will start from the car...

Open to Public
Featured image for Summer evening walk - Molonglo Nature Reserve

Thu 19th Dec 2024

Summer evening walk - Molonglo Nature Reserve

An evening walk in Molonglo Nature Reserve. We'll follow the trail wandering in the Pine forest, reach the summit of Barrer Hill, stroll down to the M...

Open to Public Activity Full